• Hugo’s Hotel – Paceville

    On: 08/06/2017
    In:
    Views: 7217
     Like

     

     

    Description of the works
    Construction of an Extension to Hugo’s Hotel, Paceville

     

    Duration of the Works: 16 Months

    Client: Mr. Hugo Chetcuti

    Architect: Perit Christian Spiteri

     

    Construction Methodology

    • Waterproofing
    • Construction of R/C Cores
    • Construction of HCB Walls
    • Construction of Omnia Slabs
    • Roofing Works
    Read More
  • Q1 Tower – Tigne

    On: 25/05/2017
    In:
    Views: 5248
     Like

    Description of the works
    Design and Construction of the Superstructure for Residential Block at Tigne – Q1 Tower

     

    Duration of the Works: 13 months

    Client: Tigne Contracting Ltd

    Architect: TBA

     

    Construction Methodology

    • Construction of R/C Columns & Walls
    • Construction of RC Cores
    • Construction of HCB Walls
    • Construction of Precast concrete edge profiles
    • Construction of Predalles Slabs
    • Roofing works
    Read More
  • Q2 Tower – Tigne

    On: 25/05/2017
    In:
    Views: 4796
     Like

     

    Description of works

    Design and Construction of a Residential Block at Tigne – Q2 Tower

     

    Duration of the Works: 21 months

    Client: Tigne Contracting Ltd

    Architect: Perit Adrian Falzon

     

    Construction Methodology

    • Construction of R/C Columns & Walls
    • Construction of RC Cores
    • Construction of HCB Walls
    • Construction of Precast concrete edge profiles
    • Construction of Predalles Slabs
    • Roofing works
    Read More
  • San Antonio Hotel – Qawra – Phase 1

    On: 25/05/2017
    In:
    Views: 5101
     Like

    Description of the works
    Upgrading of Terraces and Landscaping Areas, at San Antonio Hotel, Qawra

     

    Duration of the Works: 4 months

    Client: Mr. Vince Degiorgio o.b.o San Antonio Hotel & Spa

    Architect: EM Architects

     

    Construction Methodology

    • Demolition of exiting RC ground slabs
    • Installation of rain water runoff system
    • Construction of concrete slabs laid to falls
    • Waterproofing/drainage layer
    • Construction of pool area
    • Construction of groundslab on Igloos for laying of tiles
    Read More
  • San Antonio Hotel – Qawra – Phase 2

    On: 25/05/2017
    In:
    Views: 5106
     Like

    Description of the works
    Extension & Refurbishment of San Antonio hotel in Qawra including reinforcing of existing structure and construction of an additional 2 floors

     

    Duration of the Works: 4 months

    Client: Mr. Vince Degiorgio o.b.o San Antonio Hotel & Spa

    Architect: EM Architects

     

    Construction Methodology

    • Reinforcing of existing structure in levels -1 to level 4
    • Alteration works at Level 4
    • Construction of additional rooms at levels 5 & 6
    • Construction of HCB Walls
    • Construction of Precast Walls/Balconies
    • Construction of omnia predalles slabs
    • Construction of pool in roof terrace
    Read More
  • Seabank Hotel – Mellieha

    On: 25/05/2017
    In:
    Views: 5758
     Like

    Description of the works
    Construction of Underground Car Park and Overlying Pool Deck

     

    Duration of the Works: 3 months

    Client: Seabank Group

    Architect: Perit Pierre Farrugia

     

    Construction Methodology

    • Waterproofing works at foundation level
    • Construction of foundation for walls/columns
    • Construction of columns/HCB Walls
    • Laying of Precast Prestressed Panels
    • RC Topping
    • Construction of Indoor pool
    Read More
  • Palazzo Consiglia – Valletta

    On: 25/05/2017
    In:
    Views: 5768
     Like

     

     

    Description of the works
    Restoration of existing Palazzo in Valletta, and change of use to a Boutique Hotel including the construction of an additional basement and internal alterations

     

    Duration of the Works: 13 months

    Client: GP Borg Holdings

    Architect: Perit Chris Azzopardi

    Designer: Carlo Schembri

    Engineer: Ing. Johann Aloisio

     

    Construction Methodology

    • Stripping of Exiting Stone Slab and services
    • Partial Demolition works
    • Excavation under SCH Supervision
    • Protection of archaeological findings
    • Construction of basement masonry walls
    • Constructional of slabs from stone slabs/wooden beams
    • Formation of intermediate floor in Piano Nobile with a lightweight steel structure
    • Construction of additional floor
    • Restoration of facade inc wooden apertures/balconies
    • Restoration of internal courtyard & main grand staircase
    • Installation of Rainwater, Drainage Services
    • M&E Works
    • Finishes
    • ELV

     

    Read More
  • The National Flood Relief Project

    On: 25/05/2017
    In:
    Views: 3087
     Like

    Description of the works
    Construction of RC ground slabs and part walls to form lining of excavated tunnels for a length of circa 1.5 kM

     

    Duration of the Works:  6 months

    Client: BM Tunnels JV

     

    Construction Methodology

    • Construction of R/C ground slabs along tunnel
    • Construction of Composite Omnia Predalle walls 2.2 m high
    Read More
  • Life Science Centre – San Gwann

    On: 24/05/2017
    In:
    Views: 3297
     Like

     

    Description of the works
    Construction of LS12 Zone A at the Life Sciences centre in San Gwann

     

    Duration of the Works:  8 months

    Client: Ritemix Ltd

     

    Construction Methodology

    • Construction of R/C Footings and Foundations
    • Underground Services Installation
    • Waterproofing
    • Construction of HCB Walls
    • Construction of RC cast in situ Slabs
    • Roofing Works
    Read More
  • Bastion House – Offices

    On: 23/05/2017
    In:
    Views: 2870
     Like

     

    Description of the works

    Construction of office space


    Duration of the Works: 12 months

    Client: Bastion House Limited

    Architect: MJM DA

     

    Construction Methodology

    • Construction of reservoirs
    • Underground installations
    • Construction of foundations
    • Construction of concrete frame structure including concrete columns/beams and prestressed slabs
    • Waterproofing works
    • Roofing works
    Read More