The National Flood Relief Project

Flood Relief Tunnel

Description of the works
Construction of RC ground slabs and part walls to form lining of excavated tunnels for a length of circa 1.5 kM

 

Duration of the Works:  6 months

Client: BM Tunnels JV

 

Construction Methodology

  • Construction of R/C ground slabs along tunnel
  • Construction of Composite Omnia Predalle walls 2.2 m high