GP Portfolio
25/05/2017
Description of the works Construction of RC ground slabs and part walls to form lining of excavated tunnels for a length of circa 1.5 kM
Duration of the Works: 6 months
Client: BM Tunnels JV
Construction Methodology
Comments are closed.