    In order to control the cost of your construction project, Quantity Surveyors will accurately measure the work that is required, and apply their expert knowledge of the costs of labour, materials and plant. Additionally through the surveying, they will conduct such tasks as cost planning, value engineering, feasibility studies, cost benefit analyses, lifecycle costing, valuation, and cost estimation. The financial implications of any design decisions are therefore understood at an early stage of the project and the client can be sure to obtain good value for the money that is invested.

    Read More
  • Project Management

    On: 29/06/2015
    In:
    Views: 2034
     Like

    The Company’s Project Managers are involved immediately from the Tendering Stage. When the company is awarded the contract, the same Project Manager would select the best suited workforce for the particular job. Apart from the actual construction phase, if the task at hand is a “Turnkey Project”, the Project Manager responsible on site will coordinate all finishing trades with the architect responsible, or an appointed site supervisor, so as to ensure best quality workmanship and completion on time.

    Read More
  • Construction

    On: 29/06/2015
    In:
    Views: 6112
     Like

    GP Borg has been at the forefront in the construction industry and built some of the most prestigious project in Malta including amongst others;

    • Blue Harbour
    • Gallaria Shopping Complex
    • Fortina Spa Resort
    • Corners Edge
    • Balluta Terrace
    • Madliena Ridge – 24 Villas
    • Marks & Spencer
    • Paranga Restaurant
    • Plaza Shopping Complex
    • Castle Towers
    • Bridgeview Court
    • MIDI – T17 East & West
    • PAMA Shopping Village
    Read More
  • Plant Hire

    On: 29/06/2015
    In:
    Views: 5088
     Like

    The Company plant hire service provides the most comprehensive fleet on the island and is well equipped with construction equipment such as Hydraulic Mobile Cranes of various capacity and Tower Cranes to cater for larger construction sites. The Company is also equipped with a concrete pump which is also available for hire to many other Building Contractors.

    Read More
  • Precast Hollow Concrete Blocks

    On: 04/05/2015
    In:
    Views: 7952
     Like

    GP Borg produces between 4000 and 6000 hollow concrete blocks every day so as to cater to their clients’ requirements in as short a time as possible. Such blocks are suitable for external and internal cavity walls, separating load bearing as well as non-load bearing walls. The available range is classified in four basic types according to their thickness: 150mm, 180mm, 230mm single, and 230mm double thickness. A substantial stock is available at all times.

    Read More
  • Marks & Spencer

    On: 02/05/2015
    In:
    Views: 2486
     Like

     

    Description:

    Marks & Spencer, extension of commercial outlet + residential apartments.

    Duration of the Works: 18 months

    Architects: DeMicoli & Associates

    Client: Retail Holdings Limited Construction

    Methodology:

    • Construction of foundation for walls and columns

    • Construction of columns

    • Waterproofing works

    • Construction of HCB Walls

    • Construction of RC Cast in situ Slabs

    Read More
  • Balluta Apartments – St Julian’s

    On: 02/05/2015
    In:
    Views: 3108
     Like

     

    Description of the works
    Construction of an Underground Parking and 95 Residential Apartments at Balluta

     

    Duration of the Works: 14 months

    Client: TMCC LTD

    Architect: JB Architects

     

    Construction Methodology

    • Construction of R/C Footings and Foundations
    • Underground Services Installation
    • Waterproofing
    • Construction of R/C Cores
    • Construction of HCB Walls
    • Construction of Solid Slabs
    • Construction of Precalles RC Slabs
    • Roofing Works

     

    Read More
  • 24 Villas – Madliena

    On: 02/05/2015
    In:
    Views: 3336
     Like

     

    Description of the works
    Civil Works and Construction of 24 Semi-Detached Villas in Madliena

     

    Duration of the Works: 3 years

    Client: Madliena Ridge Ltd

    Architect: Perit Christian Spiteri

     

    Construction Methodology

    • Demolition of Existing Villas
    • Excavation Works
    • Construction of R/C Footings and Foundations
    • Underground Services Installation
    • Waterproofing
    • Construction of HCB Walls
    • Construction of Solid Slabs
    • Construction of Predalles RC Slabs
    • Roofing Works
    Read More
  • Fortina Spa Resort

    On: 02/05/2015
    In:
    Views: 2689
     Like

     

    Description of works:

    Construction of 17 storey 5-star hotel, 4 storey spa centre housing the world’s 1st therapeutic spa bedrooms, conference facilities, and 5 swimming pools

    Duration of the Works: 2 years

    Architects: Perit Neol Debattista

    Client: Fortel Limited

    Construction Methodology:

    • Construction of platform as foundation for construction of tower

    • Construction of columns

    • Waterproofing works

    • Construction of HCB Walls

    • Construction of RC Cast in situ Slabs

    Read More
  • Gallaria

    On: 02/05/2015
    In:
    Views: 1890
     Like

    The Gallaria in Fgura – a 2 storey parking and 4 storey commercial premises, 3 cinema auditorium and 40 shops Construction completed in 8 months.