PAMA Shopping Village – Mosta

 

Description of the works
Design and Construction of PAMA Shopping Complex and Car Park in Mosta

 

Duration of the Works: 8 months

Client: PG Holdings Ltd

Architect: Med Design Architects

Structural Engineer: Perit Chris Azzopardi

 

Construction Methodology

  • Stripping
  • Demolition
  • Excavation
  • Construction of R/C Footings and Foundations
  • Waterproofing
  • Construction of Masonry Walls
  • Construction of RC Slabs & Predalles Slabs
  • Prestressed Precast Hollow Core Slabs
  • Roofing Works
  • Underground Services
  • Backfill
  • Roadworks

Comments are closed.