Q1 Tower – Tigne

Description of the works
Design and Construction of the Superstructure for Residential Block at Tigne – Q1 Tower

 

Duration of the Works: 13 months

Client: Tigne Contracting Ltd

Architect: TBA

 

Construction Methodology

  • Construction of R/C Columns & Walls
  • Construction of RC Cores
  • Construction of HCB Walls
  • Construction of Precast concrete edge profiles
  • Construction of Predalles Slabs
  • Roofing works

Comments are closed.