Q2 Tower – Tigne

 

Description of works

Design and Construction of a Residential Block at Tigne – Q2 Tower

 

Duration of the Works: 21 months

Client: Tigne Contracting Ltd

Architect: Perit Adrian Falzon

 

Construction Methodology

  • Construction of R/C Columns & Walls
  • Construction of RC Cores
  • Construction of HCB Walls
  • Construction of Precast concrete edge profiles
  • Construction of Predalles Slabs
  • Roofing works

Comments are closed.