15/05/2017
Description of the works
Construction of 55 garages in over 3 levels, 4 maisonettes in ground floor level, 24 apartments and 4 penthouses over 9 levels.
Duration of the Works: 14 Months
Client: TMCC LTD
Architect: Perit Chris Azzopardi
Construction Methodology